I. Pre-Installation Preparation

1. Site Assessment

  • Verify foundation levelness (≤3mm/m tolerance)
  • Confirm tank diameter matches panel curvature radius
  • Mark anchor bolt positions per engineering drawings
Corrugated Metal Tanks installation guide
Corrugated Metal Tanks installation guide

2. Material Inspection

CheckpointAcceptance CriteriaPanel Flatness≤2mm deviation per 1m lengthCorrosion ProtectionMinimum 200μm galvanized coating (per ASTM A123)Edge DamageNo visible dents >5mm depth within 50mm of edges

3. Tool Preparation

  • Essential Tools:
    • Magnetic drill (for 12-19mm bolt holes)
    • Torque wrench (50-100Nm capacity)
    • Laser level (±1mm accuracy)
    • Panel lifter (max. 500kg capacity)

II. Installation Procedure

1. Panel Layout Calculation

  • Use formula: Panel Length = π × (Tank ID + 2×Panel Thickness) ÷ Number of Panels
  • Account for 3-5mm thermal expansion gap between panels

2. Template Fabrication

  • Cut 10mm steel plate to exact panel arc length
  • Mark vertical stitch lines at 600mm intervals

3. Installation Sequence

  1. Install starter course with 2° outward tilt
  2. Stagger vertical joints by ≥300mm in adjacent courses
  3. Use M12 galvanized bolts at 300mm spacing (pre-torqued to 75Nm)

4. Critical Connections

Joint TypeInstallation MethodHorizontal SeamsButyl tape + 25mm lap with 6mm rivets @ 150mm spacingVertical SeamsStructural silicone sealant (20mm bead width)

5. Corrosion Protection

  • Apply zinc-rich primer (DFT 75μm) within 4hrs of installation
  • Topcoat with polyurethane (DFT 125μm) after 24hrs curing

III. Quality Control Measures

1. Dimensional Tolerances

ParameterAllowable DeviationCumulative Circumference±0.2% of design diameterLocal Waviness≤3mm in any 1m² area

2. Post-Installation Tests

  • Helium Leak Test: For tanks holding volatile liquids
  • Water Spray Test: 5L/m²/min for 30min to check seams

IV. Safety Protocols

  • Use fall arrest systems when working above 1.8m
  • Implement hot work permit system for welding operations
  • Conduct daily tool box talks focusing on pinch point hazards